This week we were fast approaching our deadline, we had to ensure that all footage was done and all editing was up to scratch. We had to make sure everything was at a good level ready for Tuesday 18th March. When Tuesday had come around we wanted to stay in school and go every little bit of detail to make sure we were hitting all our targets to make it look like a really good music video. Once fully edited we had shown both teachers to see what their opinion was and if we needed to make any changes. We were told to tweak a few minor things in our music video which was changed in about half an hour. Once changed we had uploaded our music video to YouTube. On Wednesday 19th we had begun the evaluation stage for the music video.
How does this fit in with the production schedule/job roles/overall ideas of the project?
By completing our music video we have successfully been on track with our production schedule, we were in no panic to fit in any more shooting or editing. We both stuck to our jobs well as I directed the way i felt would look good in our music video in the editing and Prinul had done most of the editing as he was more advanced in that field.
Were there any problems?
There were no problems faces this week. Our music video was completed to a really good standard and felt that we were able to submit a good piece of work that enable us top marks.
There were no problems to overcome or solve this week.
What are the plans for the following week?
In the upcoming week I will be continuing on with my evaluation for the music video. I am aiming to get this evaluation completed so i can look back at previous blog posts and change anything if needed.